Lakina Bridge Repaired After Damage 8/4/10

The State Department of Transportation and Public Facilities has completed temporary repair work to the Lakina River Bridge near McCarthy, after a construction vehicle bearing an over-sized load damaged the bridge last week. The department says the repairs have improved the bridge’s structural integrity, but it’s still not able to accommodate heavy loads. DOT employees are currently stationed at the bridge during its limited hours of operation to monitor those loads. KCHU’s Erik Wander has more:

Download | Duration: 00:02:30

 

What did you think of this article?




Trackbacks
  • No trackbacks exist for this post.
Comments
  • No comments exist for this post.
Leave a comment

Submitted comments are subject to moderation before being displayed.

 Name

 Email (will not be published)

Your comment is 0 characters limited to 3000 characters.